Outages & Closures
Parking Lot Closure for Striping Project – City Owned Parking Lot – Northeast Corner of W. 7th St and S. Ohio Ave. Intersection
Beginning at 6:00 a.m. on Thursday, August 31, 2023 and continuing through 4:00 p.m., the parking lot located at the northeast corner of W. 7th St. and S. Ohio Ave. intersection will be closed. The City of Sedalia will have crews striping the lot. Notice is hereby given to the public that any vehicles parked…
Read MoreParking Lot Closure for Striping Project – City Owned Parking Lot – Southwest Corner of E. 3rd St. and S. Lamine Ave. Intersection
Beginning at 6:00 a.m. on Monday, August 28, 2023 and continuing through 4:00 p.m., the parking lot located at the southwest corner of E. 3rd St. and S. Lamine Ave. intersection will be closed. The City of Sedalia will have crews striping the lot. Notice is hereby given to the public that any vehicles parked…
Read MoreClinton Road: Intermittent Lane Closure-Ditch Maintenance — Wednesday, August 23, 2023 from 5:00 a.m. to 5:00 p.m.
The City of Sedalia Crews will be conducting ditch maintenance along Clinton Rd. from 5:00 a.m. to 5:00 p.m. on Wednesday, August 23, 2023, from the 2300 block of Clinton Rd. (Fischer Concrete) to the 2400 block (Mid-City Lumber). This work will be taking place along the north side of Clinton Rd. During this period,…
Read MoreW. Main St. Resurfacing – East Entrance of B&B Theaters to Oak Grove Lane – Mill and Overlay to Begin Monday, August 7, 2023 Through Friday, August 11, 2023
Beginning on Monday, August 7, 2023 and continuing through Friday, August 11, 2023, the City of Sedalia’s Public Works Department will be milling and overlaying W. Main St. from the east entrance of B&B Theaters to Oak Grove Lane. During this period, lane closures will result in the roadway being reduced to a single lane…
Read MoreWater Main Break
The Sedalia Public Works Department was notified of a water main break at approximately 5:00 p.m. last night in the area of W. 20th Street and S. Limit Avenue. It was a 16 inch main approximately 9 feet deep. The crews were on site overnight working to restore water service to the area. Water has…
Read MoreW. Main St. Resurfacing — Winchester Dr. to the East Entrance of Sunset Village Mobile Home Park — Mill and Overlay to Begin Monday, July 24, 2023 through Friday, July 28, 2023
Beginning on Monday, July 24, 2023 and continuing through Friday, July 28, 2023, the City of Sedalia’s Public Works Department will be milling and overlaying W. Main St. from Winchester Dr. to the east entrance of Sunset Village Mobile Home Park. During this period, lane closures will result in the roadway being reduced to a…
Read MoreW. Main St. Resurfacing — Thompson Rd. to Winchester Dr. Mill and Overlay to Begin Monday, July 17, 2023 through Friday, July 21, 2023
Beginning on Monday, July 17, 2023 and continuing through Friday, July 21, 2023, the City of Sedalia’s Public Works Department will be milling and overlaying W. Main St. from Thompson Rd. to Winchester Dr. During this period, lane closures will result in the roadway being reduced to a single lane of traffic and a reduced…
Read MoreUkrainian Festival – Downtown Sedalia Road/Parking Lot Closures, Sat., April 29, 2023
The City of Sedalia Public Works Department will be closing several streets and some parking spaces in the downtown area on Sat., April 29, 2023 from 8:00 a.m. until 11:00 p.m. The street closures are planned so that vehicle traffic will not inhibit children and other pedestrians moving freely between activities at the Ukrainian Festival…
Read MoreEAST U.S. HIGHWAY 50 (BROADWAY BLVD.) RESURFACING
Beginning on Mon., Apr. 10, 2023 and continuing through Fri., Apr. 14, 2023, the City of Sedalia’s Public Works Department partnering with the Missouri Department of Transportation (MoDOT) will be milling and overlaying E. Broadway Blvd. (U.S. Highway 50) between S. Massachusetts Ave. and S. Thompson Ave. During this period, lane closures will result in…
Read MoreAnnual Mill and Asphalt Overlay Projects
The City of Sedalia’s annual asphalt mill and overlay program is scheduled to begin on Apr. 3, 2023 and will improve 4.74 centerline miles of city streets during the 2023 construction season. The project areas are detailed in the below map and include City projects in red and a project being coordinated between the City…
Read More